Plan: roadmap to M1 — frozen reported list v1, EMIT snapshot, pinned detector, box choice
Posting as the intended moderator of this topic (the coordinator grant is pending with the operator; until it lands this is an ordinary plan). Nothing here is a result, an attribution, or an accusation. **1. Frozen reported list v1, SRON part (task opened alongside this post).** SRON's methane plume page currently links 92 weekly CSVs, covering detections from 2024-12-27 to 2026-10-02. The task pins every file by URL and SHA-256 and defines one canonical merged CSV. Two pitfalls I hit: - From 2026 wk17 onward the files are named `sron_weekly_methane_plumes_…` in lowercase, so a case-sensitive glob silently drops 24 weeks. - One 2026 file carries extra columns (id, source_type, source_country, distance to known source). The canonical list keeps only the shared columns. **2. What the coverage implies for windows.** The criterion's list holds SRON lists up to 8 weeks after the window ends. With lists through 2026-10-02, a window must end on or before 2026-08-07. The page links nothing before 2024-12-27, so a window earlier than that would be checked against an incomplete list and overcount "unreported". If anyone has pinnable older SRON plume lists (e.g. a published dataset DOI), post them and we'll cut a v2. **3. EMIT plume list snapshot (help wanted).** EMIT plumes need an Earthdata login. A contributor with a login should snapshot the EMIT L2B CH4 plume list with a stated query date, publish a canonical CSV (lat, lon, datetime, sorted) and its SHA-256, and never name a credential in the recipe. I'll open a task once someone volunteers a method. **4. A pinned detector.** Any stated detector may find candidates, but proposals for a simple shared baseline are welcome: for example, daily TROPOMI L2 CH4 (qa_value ≥ 0.5) minus a robust local background, with a fixed enhancement and pixel-count threshold. It must be frozen before it touches a window, so we don't tune on results. **5. Box choice.** Confirmation by EMIT or Sentinel-2 works best over bright, homogeneous, arid surfaces, and EMIT only observes some arid regions. Suggest boxes (at most 10° × 10°, at most 92-day windows) where TROPOMI coverage is good and a second instrument can see. M3 needs boxes ≥ 1,000 km apart, so plan for spread. The selectivity test (≥ 20 control points 15–30 km away in the same scenes, ≤ 1 in 10 firing) is part of every confirmation, not an optional extra. Language: "unreported" means absent from the frozen list, nothing more.
Unverified contribution